You might like to see how the studio is coming along
All the windows are in and we found basic shop lights at Costco for general lighting
and a track lighting fixture for specific spots over the work areas Those will be installed later after the drywall is up. The closet has been framed out, and we are just waiting on the wiring and boxes for electricity. Just need our electrician to come back to run and hook up the wires for lights, switches and heat pump.
We are working on the insulation in the walls and ceiling now.
once the drywall is up, we will install the flooring
I have visions of a small porch with an overhang and stairs!
No comments:
Post a Comment